PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls

Projeto

Trabalhamos lado a lado com nossos clientes para criar grandes realizações. De andaimes a arranha-céus, pontes a túneis, destacamos os projetos que concretizamos juntos.

Todos os projetos

Os engenheiros especializados da PERI Israel combinaram a fôrma da estrutura com o escoramento para fazer o cruzamento de uma rodovia sobre uma linha férrea.
The PERI bridge formwork concept was based on rentable modular construction systems with standardized components.
A tunnel formwork system solution based on VARIOKIT makes the Tauern motorway disappear in an enclosure structure within a short construction time for a length of 1,545 meters.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - Up to 30 m high VARIOKIT VST heavy-duty shoring towers served as falsework for the construction of the bridge edge sections. Each leg carried a load of around 600 kN.
Palácio do Gelo, Viseu, Portugal - Visão geral do escoramento ROSETT e da cofragem tipo MULTIFLEX.
Torres Atlântico, Luanda, Angola - Vista geral do edifício.
O sistema UNO possui elementos leves, tecnologia e poucos acessórios, permitindo formação rápida e eficiente das estruturas.
Obra finalizada em março de 2022
Cais Maritimo de Port Malabo - Vista geral
Reabilitação dos Cais entre Santa Apolónia e o Jardim do Tabaco - Maciço descofrado e maçiços betonados
Ponte sobre o Rio Uima - Vista geral da obra de Sul para Norte
Ponte sobre o Rio Tua, Vila Real, Portugal - Para a renovação da ponte construída em 1940, foi montado o sistema de andaimes modular da PERI UP.
Monumento do Cristo Rei, Lisboa, Portugal - O trabalho foi realizado com segurança, em plataformas de trabalho espaçosas e geometricamente adaptadas do sistema PERI UP Rosett, que foi erguido até à cabeça da estátua.
Novo PIER Norte do Aeroporto da Portela - Montagem - Perspectiva do Alçado Nascente
Escola Secundária Josefa de Óbidos - Fachada tipo
Edifício na Avenida da República - Perspectiva geral da obra
Viaduto de Sacavém sobre o Rio Trancão - Perpectiva geral do andaime montado no 4º e 5.º vão
Edifício Tridente - Perspectiva geral do andaime montado
Eixo Norte/Sul Lisboa - Passagem Superior 16B: vista geral da estrutura em fase de betonagem
Viaduto Duarte Pacheco - Cobertura total do arco principal com PERI UP Rosett
Reabilitação com PERI UP da Igreja de Nossa Senhora da Conceição dos Militares
For the fabrication of the massive reinforced concrete slab below the pitch, the PERI engineers support the MULTIFLEX girder slab formwork solution with almost 8-meter high PERI UP shoring towers.
The Italian Expo pavilion has a very sophisticated architectural design and had to be built within an extremely tight time frame.
Casa da Música, Porto, Portugal - Built to coincide with “Porto 2001 – European Culture Capital”, the concert hall is pictured here after structural work had been completed.
Obra especial Edifício IME Plaza de Armas em Santiago, Chile. Realizada em parceria com a PERI Brasil para atender com excelência aos requisitos geométricos e históricos do projeto.
A PERI planejou, produziu e entregou mais de 3.500 elementos personalizados de formas para fazer a obra dentro do orçamento e entregar no prazo estipulado
Andaime PERI UP montado para auxiliar na estruturação das formas VARIO e também utilizado como plataforma de trabalho
Unidades habitacionais em paredes de concreto executadas com o sistema de formas UNO que garante uma boa qualidade de acabamento, com concretagem diárias.
Aplicação das formas UNO+ com o sistema trepante CB, trazendo segurança, economia e velocidade para a obra Solar do Porto, da MRV.
Pioneiro na utilização do sistema PERI UNO no Brasil e também o primeiro empreendimento realizado em Parede de Concreto pela executora do projeto
Núcleos em concreto armado do Edifício Comercial Viol executados com forma VARIO e sistemas auto trepantes RCS e ACS (Mastro de Concretagem), dando maior produtividade e segurança além de dispensar a utilização de gruas
A Unidade de Industrialização do Xisto (SIX) é uma unidade de operações localizada sobre uma das maiores reservas mundiais de xisto.
Fornecimento de formas e andaimes para construção de uma fábrica de cervejas em Uberaba, Minas Gerais
Terminal Norte e Terminal RO-RO do Porto de Aveiro - Estrutura posicionada na 1ª betonagem
Offset-arranged floors and countless cantilevered balconies required a detailed formwork and enclosure concept.
The Al Habtoor City Towers are three high-rise buildings which are growing up to a height of 300 meters at the same time.
The design of modern architecture confronts construction with very sophisticated demands.
PERI Projecto - Engenharia Hidraúlica - Barragem de Foz Tua, Alijó - Vila Real, Portugal
Aproveitamento Hidroeléctrico de Ribeiradio-Ermida - Vista de Montante
Reforço de Potência da Venda Nova III - Visualização da zona superior onde se realizará o canal da tomada de água
Etar da Guia - Vista da cofragem utilizada para execução de decantador; muro circular de R=15.5m executado em 4 fases.
Barragem de Pedrógão - Vista geral do paramento jusante em fase de recobrimento de betão convencional.
Barragem do Alqueva - Vista geral
Lötschberg Tunnel, Mitholz, Switzerland - Tunnel formwork carriage for a cross-section width of 15.74 m and 12.54 m high. At first, the tunnel side walls were shuttered and concreted.
Marchlehner Gallery, Sölden, Austria - The VARIOKIT tunnel formwork solution accelerated construction of the 228 m long Marchlehner gallery situated at a height of 1,800 m above sea level. The competent planning process took into account al possible project requirements which ensured on-schedule completion before the onset of winter.
Mega Bridge, Industrial Ring Road, Bangkok, Thailand - The four pylons of spectacular Mega Bridge in Bangkok rise 173 m into the sky. For the realization, the ACS climbing system ensured rapid construction process.
Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
Metro extension, Algiers - The Algerian metro station "Place des Martyrs" is 144 m long and features record-breaking dimensions with its 23 m width and 14.80 m height.
Mur Bridge Frohnleiten - For the construction of the Mur Bridge near Frohnleiten, the new VARIOKIT heavy-duty truss from PERI has set new standards in shoring operations.
Øresund Link, Denmark–Sweden - One of the two production lines with the formwork assemblies reaching a total weight of 1,150 t. Here the internal formwork has been retracted into the reinforcement cage.
Munich Airport Satellite Terminal, Germany - The 600 m long, new satellite terminal at Munich airport is located in the centre of the airfield and encloses the apron tower and incorporates the existing baggage sorting centre. Construction is taking place during normal airport operations and presents an enormous challenge to all those involved in the project.
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
The Squaire, Frankfurt am Main, Germany - PERI UP scaffolding on the longitudinal sides of the building was designed according to the expected loads and carried the construction loads.
Traffic junction Czerniakowska, Warsaw, Poland - The pre-stressed hollow box superstructure was formed with VARIO GT 24 wall formwork and MULTIFLEX slab formwork.
Traffic junction Siekierkowska roadway, Warsaw, Poland - For the superstructure formwork as well as the shoring construction consisting of the MULTIPROP system and ST 100 stacking towers, only system components were used.
Puente Baluarte, Mexico - Apart from the two pylons, a total of nine double piers are being constructed on both sides of the ravine which are braced by means of massive cross beams.
Puente de La Pepa, Bahia de Cádiz, Spain - Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.
Tunnel bypass Flüelen, Switzerland - The special support und moving construction comprised of elements from the PERI tunnel waler system which adapted exactly to each cross-section. The complete formwork unit could be moved on rails from section to section using pulling equipment supplied by the contractors. Due to economic reasons, setting and stripping were done mechanically.
Tunnel Jumeirah Palm Island, Dubai, United Arab Emirates - In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.
Tunnel Limerick, Ireland - Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
Nordhavnsvej Tunnel - The formwork carriage has been designed so that trucks can pass through at any time without obstacles. Due to the cramped site conditions, an absolutely essential requirement for the execution.
Bypass tunnel Sochi, Russia - For construction of the emergency parking bays, the formwork carriage was designed with a width of 14.30 m. Moving the carriage to the next bay through the smaller-sized standard cross-section, required a reduction in the maximum external dimensions.
Viaduc de Millau, France - In the area of the double piers, 14 complete ACS self-climbing units with telescopic working platforms were used.
Waldschlösschenbrücke, Dresden, Germany - Two steel arches, each with a span of 148 m, carry the middle section of the Waldschloesschen Bridge 26 m above the Elbe.
Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.
Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.
Barangaroo South, Sydney - The three ITS high-rise towers for the centre of the ambitious Barangaroo South project in the Sydney harbour area.
Overview of the construction site - PERI Project - "Humboldt Forum" City Palace, Berlin
LGS Weather Protection Roof from PERI, the lattice girder system for weather protection, rain protection, snow protection, hail protection.
Unusual Scaffolding solution: Cantilevered instead of positioning. New engineered working scaffold solution.
Earthquake-proof shoring solution for the Stavros Niarchos Foundation Cultural Center building in Athens. Designed by the Architect Renzo Piano.
The first of a total of three sections will become operational in the autumn of 2017.
Formwork solution with system components of VARIOKIT Engineering Construction Kit
 Skyline of Tel Aviv with a view of the construction site for the Alon Towers
Motorway bridge over the Drava, Osijek, Croatia - A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets.
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
Two 175 m high piers at a distance of 472 m from each other, take the loads of this cable stay construction which connects both sides of the Cooper River.
West tunnel of the former Elbe tunnel, which pedestrians continued to use, while the other tunnel was being repaired.
PERI brace frame structure to transfer the loads during single-sided concreting with ties of the DW 26 system, at the jobsite for the Audi tunnel in Ingolstadt.
Msheireb Metro Station, Doha
Construction of the housing complex Los Portones de Linares, Chile
Aquatics Centre, London
Construction of the Barwa Commercial Avenue, Doha, Qatar
Construction of the 76 meters high office tower.
Ohio River Bridge, Louisville, Kentucky, USA
Aspen Residence, George Town, Penang, Malaysia
Los Ramones II Pipeline, San Luis Potosi, Mexico
Infrastructure buildings, Pilbara region, Australia
Dubai Frame, United Arab Emirates
Lo Storto, The Twisted One, the future administrative building of the Generali Insurance Group
Aerial view of the jobsite “ Stadtquartier am Hirschgarten“ MK 4 “Friends“, Munich
MAXXI - Museo nazionale delle arti del XXI secolo, Rome, Italy - This extraordinary structure is characterized by twisting reinforced concrete walls which reach heights of up to 14 m.
Langen Foundation, Neuss-Hombroich, Germany - The glass veranda area is used to exhibit Japanese works of art from the last millennium.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Mercedes-Benz Museum, Stuttgart, Germany - The execution of this very impressive project required unique engineering and assembly implementation on the construction site.
Musée Würth, Erstein, France - With the flexible VARIO GT 24 wall formwork system, the requirements regarding the formlining joint arrangement as well as the requested execution and positioning of the tie points could easily be fulfilled.
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
National stadium Kazimierz Górski, Warsaw, Poland - The complex construction project with highest quality requirements demanded an experienced construction site team as well as on-site support through PERI engineers.
Parco della Musica e della Cultura, Florence, Italy - The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
St. Canisius Church, Berlin, Germany - The modern reinforced concrete design is characterized by exactly defined requirements placed on the visible concrete surfaces.
Restaurante Florante Submarino, Valencia, Spain - With 77 t of PERI UP Rosett materials, the building´s design could be accurately realized as a three-dimensional spatial load-bearing structure.
Heavy athletics stadium, Athens, Greece - HD 200 heavy-duty props combined with the MULTIPROP system formed a 21.00 m high shoring tower for load transfers of 500 kN.
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
St. Martins Therme & Lodge, Frauenkirchen, Austria - With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
Temple of Divine Providence, Warsaw, Poland - With the help of the PERI UP Rosett modular scaffold system, 24-metre high shoring was erected at the main entrance of the temple. Even at large heights, up to 40 kN per leg could be safely and reliably transferred.
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
VitraHaus, Weil am Rhein, Germany - For the VitraHaus, twelve reinforced concrete bodies with massive gable roofs were stacked up to form a 20 m high building complex.
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
Sandelermöns Waterworks, Jever, Germany, PERI project
Canal bridge over the river Elbe, waterway junction Magdeburg, Germany - The 17 monumental piers of the foreland bridge are characterised by positioned tie points, dummy joints, clearly defined recesses and geometry resembling the shape of a ship´s bow. The contractor also used VARIO GT 24 wall formwork here and achieved excellent concrete surfaces.
Sewage plant As Samra, Jordan - With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
Nile river barrage Naga Hammadi, Egypt - The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
Lock facilities, Panama Canal, Panama - More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
Gravity dam Barrage Koudiat Acerdoune, Algeria - The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Karlskirche Church Vienna, Austria - The cantilevered working platform as seen from the visitors platform.
Maritime museum Tallinn, Estonia - A total of 8,500 m² of exhibition space is now available under the three domes.
Bridge over the Dunajec, Tarnow, Poland - With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method.
Motorway Bridge D1, Považská Bystrica, Slovakia - The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
Auditorio de Tenerife, Tenerife, Spain - The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
ADAC Headquarters, Munich, Germany - For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
21st Century Tower, Dubai, United Arab Emirates - The RCS climbing protection panel complete encloses the upper floors under construction and provides protection against wind and weather - and increases productivity.
Hradec Králové Library, Czech Republic - With an X-shaped floor plan, the architectural concept of this building created a new highlight in the urban development of the city of Hradec Králové. Originally, all external surfaces should have received an orange-painted facade. This concept was completely rejected due to the high-quality concrete surface finish.
Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Catholic Church Centre, Cologne-Blumenberg, Germany - 6 m long units with frames comprised of U 120 steel walers were positioned in pairs after the supporting scaffold, consisting of ST 100 stacking towers, had been adjusted.
Museum of military history, Dresden, Germany - The almost 100 m long Libeskind-designed structure features a 30-metre high wedge tip made of glass and steel.
Banco de la Ciudad de Buenos Aires - A standardized construction kit system as well as the planning and delivery of formwork and scaffolding from a single source makes the PERI project solution very cost-effective.
Federal Chancellery Berlin - The challenging building form called for flexibly adaptable formwork and scaffolding systems.
DaimlerChrysler Subsidiary Warsaw, Poland - Not far from Warsaw‘s city centre, the new headquarters building of the automotive group together with a Mercedes-Benz dealership containing showrooms and a service centre has been realized.
Der neue Zollhof, Düsseldorf, Germany - The three spectacular buildings of the new Zollhof complex in Dusseldorf during different stages of construction.
Hotel Capella, Sentosa Island, Singapore - The new 6-star hotel complex was constructed around two buildings dating from the colonial times. With SKYDECK, the construction of the reinforced concrete slabs could be carried out efficiently and safely.
Hotel Marques de Riscal, Elciego, Spain - Designed by Frank O. Gehry, the building complex consists of several cuboids pushed into each other and an almost free-floating roof skin made of titanium.
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany - The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
Potsdamer Platz, Berlin, Germany - The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
South Health Campus, Calgary, Canada - The main building of the medical facility, situated south-west of Calgary, features two basement and eight upper levels each with around 20,000 m² of slab area.
Absolute World, Missisauga, Canada - One climbing system – two climbing methods: with protection provided by the RCS climbing protection panel, the two twisting Absolute World towers rose steadily upwards in regular weekly cycles.
Al Hamra Tower, Kuwait City, Kuwait - Already during the construction phase, the Al Hamra Tower stood out through its timeless elegance which was achieved by turning the external facade by 130 degrees.
Avala TV Tower, Belgrade, Serbia - The perfectly adapted shoring and working scaffold optimally supplemented the cost-effective formwork solution.
Cuatro Torres Business Area, Madrid, Spain - For the very wide range of requirements, PERI provided the most cost-effective solution with the ACS self-climbing formwork.
European Court of Justice, Luxembourg - The RCS climbing protection panel completely enclosed the slab edges of the upper floors under construction.
Evolution Tower, Moscow, Russia - Inclined and crane-independently climbed RCS protection panel units provide here a very high level of safety.
Hotel Mélia, La Défense, Paris, France - For the construction of the Hotel Meliá in the "La Défense" office district, PERI developed a comprehensive climbing formwork solution. This serves not only as an enclosure, which ensures the safety of the construction teams at all times, but also it supports the precast parapets during erection.
Il Bosco Verticale, Milan, Italy - Massive, 28 cm thick reinforced concrete balconies cantilever outwards for 3.35 m in an irregular fashion on all four sides of the building.
ISET Tower, Yekaterinburg, Russia - The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
JKG Tower, Jalan Raja Laut, Kuala Lumpur - A complete solution consisting of formwork, scaffolding and related services has guaranteed safety at all heights and rapid progress during the construction of JKG Tower complex.
Marina Bay Sands, Singapore - The American Las Vegas Sands Corporation is the owner of the complex the highly visible hotel towers.
Porta Nuova Garibaldi, Milan, Italy - Each of the two towers has three reinforced concrete cores which were constructed with help of two PERI ACS self-climbing variants.
Prosta Tower, Warsaw, Poland - The PERI UP scaffolding extended upwards on the outside keeping pace with the construction progress.
RONDO 1, Warsaw, Poland - The PERI CPP climbing protection panel reliably encloses the upper floors under construction.
Torre Agbar, Barcelona, Spain - The cylindrical core and facade walls of this 142 m high office building were constructed with PERI ACS self-climbing technology.
Las Torres de Hércules, Los Barrios, Spain - Over the entire height, oversized letters into the concrete facade symbolize the inscription "Non plus ultra".
Trump International Hotel & Tower, Chicago, USA - With a height of 415 m, the Trump International Hotel and Tower on the Chicago River is a very impressive skyscraper.
Trump World Tower III, New York, USA - With a height of 258 m and its luxurious furnishings, the Trump World Tower completely re-defined the New York skyline.
Turning Torso, Malmö, Sweden - The Turning Torso structure turns at an angle of 90° as it climbs upwards over nine cubes – each cube consists of five floors.
Warsaw Spire - With a height of 220 m, the new office tower of the "Warsaw Spire" building ensemble will be the tallest office building in Warsaw after completion. Two office buildings flank the tower, each 55 m high.
Albian Sands, Fort McMurray, Canada - Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
Refuse Derived Heating and Power Station, Spremberg, Germany - The VARIOKIT heavy-duty shoring towers with a height of 23.60 m can support loads of over 200 t in each case. The horizontal assembly of the approx. 10 m high tower sections makes the erection of the shoring easy and safe.
Grain Silo near Parma, Italy - Cost-effective PERI climbing concept: with a complete platform level and halved on-site wall formwork requirements, fast and continuous working operations were achieved.
Power plant Belchatow, Poland - The two-storey supporting structure, with a height of 25 metres, accommodates the sorption installation for the flue gas desulphurisation.
Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
LNG liquid gas reservoirs, Cameron, USA - In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
Exhibition centre Bilbao, Spain - For the construction of the Bilbao Exhibition Centre, PERI engineers developed a practical movable falsework and formwork solution.
Palm paper mill, King’s Lynn, Great Britain - Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
Stanari Thermal Power Station, Doboj, Bosnia-Herzegovina - A total of 9 circular piers with 3.60 m diameters and 40 cm wall thicknesses will subsequently carry a steel platform for the condenser.
Cement plant Ivano-Frankowsk, Ukraine - For extending the cement plant, engineers from PERI Ukraine designed a comprehensive and sophisticated formwork and scaffolding solution.
Viaduct Krakow-Płaszow Railway Junction - Customized solution through the flexible and modular adaptability of the system.
Oparno Motorway Bridge, Czech Republic - The 258 m long and 50 m high arched bridge crosses the Opamo Valley in the Bohemian Forest.
Trmice Motorway Bridge, Aussig, Czech Republic - For the 1,083 m long Trmice motorway bridge near Aussig in the Czech Republic, 59 piers were cost-effectively formed using PERI formwork.
Térénez Bridge, Crozon, France - Using a combination of ACS self climbing technology and VARIO GT 24 girder wall formwork, a crane-independent and safe solution was developed.
Tošanovice-Žukov Bridge, Ostrava, Czech Republic - The VARIOKIT steel composite carriage consisted of three main components: the formwork units, cross frames and the two longitudinal trusses.
Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
Chachenka Motorway Bridge, Moscow, Russia - The 22.25 m wide superstructure sections were constructed with section lengths ranging from 3.40 m to 4.10 m in regular 10-day cycles.
Citytunnel Malmö, Sweden - The southern entrance area was constructed using the cut-and-cover method for a length of around 1.5 km.
The 3rd Bosphorus Bridge has the highest concrete bridge piers in the world, and will eventually connect the European and Asian continents after its completion in 2015.
BBI Airport, Berlin Brandenburg, Germany - Only when seen from an aerial perspective is the scale of the construction site really apparent: the area is the size of around 2,000 football pitches.
Toulouse-Blagnac Airport, France - The semi-circular positioned reinforced concrete columns were concreted in one pour over the entire height of 11.75 m.
Golden Ears Bridge, Vancouver, Canada - The almost one kilometre long cable-stayed bridge over the Fraser River is the core element of the 13 kilometre long highway project.
Hongkong-Zhuhai-Macao Bridge (HZMB), China - The 180 m long tunnel elements are cast in eight individual segments each 22.50 m long – monolithic, without ties and in compliance with strict dimensional tolerances.
Lanaye Lock Bridge, Belgium - In the complex area with an extremely tight outer radius, the concentrated loads of the radially-arranged cantilever brackets are transferred into the available bridge piers by means of pressure supports.
Lekki Ikoyi Bridge, Lagos, Nigeria - The Lekki Ikoyi Bridge in Lagos is the first cable-stay bridge in Nigeria.
Over 500 complete floors were completed with the UNO Housing Formwork using a monolithic construction method.
The new corporate headquarters of Sasol have 10 upper floors and 7 basement floors.
Aerial view of the jobsite of the “villanova“ housing estate
The upper floors of the “BraWoPark Business Centers II“ in Braunschweig, where the PERI RCS climbing protection panel is used for advertising purposes on the two topmost floors.
Jobsite with scaffolds and crane at the building of the dedusting system of blast furnace 9 of ThyssenKrupp Steel Europe in Duisburg
Jeddah Gate “E3 – Abraj Al-Hilal 2“ during the shell construction
Normalmente, o DUO seria usado para construção de pequenas estruturas em substituição das fôrmas modulares em aço, uma alternativa mais eficiente. Este projeto foi uma ótima maneira de testar o DUO e ver a capacidade de utilização do sistema (Paredes, Pilares e Lajes). (Foto: seanpollock.com)
Metro de Argel - Linha e Estações - Carro de cofragem de aço de fabrico especial
Metro de Lisboa - Prolongamento da Linha Azul, Estação da Reboleira - Túnel de ventilação
Túnel da Queimada II - Vista transversal na 1ª betonagem
Túnel da Ameixoeira - Vista da estrutura da abóbada em posição de betonagem
Subconcessão do Pinhal Interior, IC3 lanço Condeixa/Coimbra - Ponte sobre o Rio Ceira
Viaduto Transrhumel - Estrutura e cofragem de Abas de Tabuleiro na Aduela do Pilar P1
V2 (Rib.ª da Mata) - Consolas de apoio SB e KG240 para capitéis. Sistema de cofragem PERI TRIO e VARIO. Torres de escadas PERI UP ROSETT.
Alargamento da Ponte sobre o Córrego do Sapé, executado com o novo sistema de treliça ALPHAKIT, vencendo um vão de 20 m, dando maior produtividade na pré-montagem e dispensando guindastes para içamento (utilização de Munck).
Uma das obras mais incríveis do nosso país.
Auto-Estrada Transmontana - Viaduto do Corgo - Vista dos conjuntos ACS.
Ponte sobre o Rio Catumbela, Angola
Viadutos do Seda e Chocanal IC-13 Alter do Chão/ Portalegre - Vista do pórtico sobre o caminho rural
Nova Ponte sobre o Rio Tejo (Carregado/Benavente)
Alargamento da A1 - Lanço Feira/IC24, Santa Maria da Feira - Aspecto geral da cofragem e cimbre de uma passagem superior.
Ponte sobre o rio Corgo - Aspecto geral da obra com início da montagem da viga de lançamento do cliente
Eixo Norte/Sul - Vista lateral da PS16A - fase da regulação da cofragem
Ponte sobre o rio Guadiana, Mourão
Viaduto da Ribeira de Perofilho - Vista geral
A árvore de Natal do Barrashopping atualmente é a maior do Rio de Janeiro e a de 2019 será feita com 75 toneladas de andaime modular PERI UP.
Árvore de Natal l Lisboa - Montagem: Elevação dos troços
Rock in Rio 2008
Rock in Rio Lisboa 2006 - Palco Mundo
Árvores de Natal, Lisboa e Varsóvia - O topo da Árvore de Natal PERI UP em Varsóvia a ser cuidadosamente posicionado.
Motorway bridge over the Rio Sordo, Vila Real, Portugal - The 2.00 m wide shoring scaffold sections are connected longitudinally by means of heavy-duty spindles and push-pull props to form shoring towers.

Interessado em saber como a PERI pode apoiar seu próximo projeto?

Ligue para nós no +55 (11) 4158 8188 para discutir mais sobre suas necessidades.

Entre em contato conosco